Welcome to the company ! we have many years of professional experience !
rsdzd@pyzyrsd.com +86 513525609655

manufacturer of 4-inch sand suction pump hose

Established in 2001, Puyang Zhong Yuan Restar Petroleum Equipment Co.,Ltd, “RSD” for short, is Henan’s high-tech enterprise with intellectual property advantages and independent legal person qualification. With registered capital of RMB 50 million, the Company has two subsidiaries-Henan Restar Separation Equipment Technology Co., Ltd We are mainly specialized in R&D, production and service of various intelligent separation and control systems in oil&gas drilling,engineering environmental protection and mining industries.We always take the lead in Chinese market shares of drilling fluid shale shaker for many years. Our products have been exported more than 20 countries and always extensively praised by customers. We are Class I network supplier of Sinopec,CNPC and CNOOC and registered supplier of ONGC, OIL India,KOC. High quality and international standard products make us gain many Large-scale drilling fluids recycling systems for Saudi Aramco and Gazprom projects.

Certificate of Honor

CONTACT US

Customer satisfaction is our first goal!

Phone

+86 513525609655

E-Mail

rsdzd@pyzyrsd.com

Address

Road West, North Branch, Jingkai Road, Puyang City

manufacturer of 4-inch sand suction pump hose
ELECTRIC WATER PUMPS
ELECTRIC WATER PUMPS

2. ,Float switch, height adjustment 3. ,Float Switch, 4. ,Pump, casing 5. Mains cable and plug 6. Hose adaptor for pressure connection 7. ,Pump, base 8. Feet 4. OPERATION 4.1. Installation and commissioning. Attach a sufficiently long and strong rope to the handle before first use. The ,pump, is submerged into the liquid on this holding rope and can also ...

EBA Titel A4 - Wilo
EBA Titel A4 - Wilo

1. Non return ,valve, 2. ,Valve, 3. ,Float switch, 4. Control box (single-phase) 5. Carrying rope 6. Fluid control 7. Supply cable 8. ,Float, in low position 9. ,Float, in high position 10. Pressure ,switch, 11. Connection box (three phase) 12. Floating ,suction, filter 13. Venting hole (Ø3 mm) 14. ,Suction, strainer 5.6 Design of ,pump, …

Radar JS ST70AB Float Switch - ALL PUMPS DIRECT
Radar JS ST70AB Float Switch - ALL PUMPS DIRECT

A basic ,float switch, to control a ,pump, for tank filling or emptying. Levels can be achieved by positioning the two weights to give a differential of 50mm to 1000mm. 110v 10 amp max. or 230v 7.5 amp max. inductive loads, can be used for ,pump, control. If ,pump, inductive load is higher then a contractor/starter/control panel must be used.

SEWAGE PUMPS - Federal Pump
SEWAGE PUMPS - Federal Pump

pipe (part.No. 79). The ,float, stop above the ,switch, arm should be set to cut out the ,float switch, before the water level drops to the top of the ,pump, casing. Press the rod guide pipe down as far as It will go into the ,switch, pedes-tal (part No. 85). For hollow tube floats, four ,float, stops are used. Adjust the ,float, stops above and below the ,float, to control op-erating range, as described above.

Wayne 1 hp 6100 gph Stainless Steel Vertical Float Switch ...
Wayne 1 hp 6100 gph Stainless Steel Vertical Float Switch ...

5100 GPH at 10 ft. of discharge lift. Submersible cast iron and stainless steel sump ,pump, with vertical ,float switch,. Top ,suction pump, design eliminates air locks and clogging from debris in ,bottom, of sump pit. Stainless steel motor housing and rugged, cast iron ,pump, base. Fully submersible.

MAIL TO SHIP TO Zoeller Pump Company TEL: (502) 778-2731 ...
MAIL TO SHIP TO Zoeller Pump Company TEL: (502) 778-2731 ...

3.1) With the ,float valve, (A) in the OFF (down) position, the ,float valve, should be placed so that the ,bottom, of the ,float, is a few inches above the primary ,pump,’s ON position. Note: The FLEX® will continue to run for a few seconds after the ,float,’s OFF position has been reached. 3.2) ®Securely clamp the ,float valve, to the FLEX ,suction, pipe, using the metal ,float, bracket and included hose clamp. 3.3) Ensure that the ,float valve,…

UPm 2/6-GE - submersible Pump single-phase with float ...
UPm 2/6-GE - submersible Pump single-phase with float ...

In addition, the UP has reduced consumption, a valve that eliminates the“effect” bell-to facilitate the expulsion of air bubbles which may form inside the pump and the inlet grating raised and not on the bottom to prevent the passage of sand, leaves and other foreign matter that may clog plumbing and reduce the performance.

Installation and operating instructions
Installation and operating instructions

Install the ,pump, so that the ,pump, inlet is at least 1 m above the ,bottom, of the well to avoid ,suction, of ,sand, and impurities. See fig. 3. Use rigid metal pipes to hang the ,pump,, and secure the pipes with brackets at the top of the well. Secure the ,pump, by attaching a wire to the lifting eye on the top of the ,pump,. Do not hang the ,pump, on the lifting wire. 3.1.5 Adjustment of the ,float switch

Installation procedure for the Wisy Rainwater system
Installation procedure for the Wisy Rainwater system

4. ,Suction, filters 5. ,Pump, control unit (panel and switchboard). 6a. Top-up solenoid ,valve, 6b. Top-up ,float switch, 6c. Top-up type A air gap 6d. Junction box 7. Dry run ,float switch, 8. Expansion Vessel 9. Pressure hoses 10. 150mm duct for cables and hoses 11. Overflow trap 12. Level gauge (optional)

+ 40°C 5” STAINLESS STEEL SUBMERSIBLE PUMP Supplying ...
+ 40°C 5” STAINLESS STEEL SUBMERSIBLE PUMP Supplying ...

on-off ,switch,, reset button, connection ter-minal for ,float switch, to prevent running dry and built-in capacitor. Speed: 2900 rpm Single-phase winding: 230 V Three-phase: 400 V Frequency : 50 Hz Insulation class: 9220155 (F) Protection class: IP 68 Start-ups per hour: 40 maxi. EC approved: CE BASIC CONSTRUCTION Main parts Material

Chat Online Inquiry Email

Business cooperation

+86 513525609655

Company address

Road West, North Branch, Jingkai Road, Puyang City