Welcome to the company ! we have many years of professional experience !
rsdzd@pyzyrsd.com +86 513525609655

desander production plant of natural gas well mouth ulcers

Established in 2001, Puyang Zhong Yuan Restar Petroleum Equipment Co.,Ltd, “RSD” for short, is Henan’s high-tech enterprise with intellectual property advantages and independent legal person qualification. With registered capital of RMB 50 million, the Company has two subsidiaries-Henan Restar Separation Equipment Technology Co., Ltd We are mainly specialized in R&D, production and service of various intelligent separation and control systems in oil&gas drilling,engineering environmental protection and mining industries.We always take the lead in Chinese market shares of drilling fluid shale shaker for many years. Our products have been exported more than 20 countries and always extensively praised by customers. We are Class I network supplier of Sinopec,CNPC and CNOOC and registered supplier of ONGC, OIL India,KOC. High quality and international standard products make us gain many Large-scale drilling fluids recycling systems for Saudi Aramco and Gazprom projects.

Certificate of Honor

CONTACT US

Customer satisfaction is our first goal!

Phone

+86 513525609655

E-Mail

rsdzd@pyzyrsd.com

Address

Road West, North Branch, Jingkai Road, Puyang City

desander production plant of natural gas well mouth ulcers
Finham STW Activated Sludge Plant (2019) | Water Projects
Finham STW Activated Sludge Plant (2019) | Water Projects

11/11/2019, · Another example of reuse of existing structures in the tertiary treatment area is the existing ,sand, filter feed ,pumping, station wet-well which was remodelled and converted to the feed ,pumping, station for the CoMag TM process. To enable reuse of the existing ,pumping, station, two-stage modelling was undertaken by Hydrotec on behalf of CiM6.

Disappearing Downhole Tools Eliminate Need for Intervention
Disappearing Downhole Tools Eliminate Need for Intervention

Many tests were conducted on simulated ,plug,-and-perf ball seats to meet the requirements of 10,000 psi at 200°F and 275°F with balls having diameters of 1.75 in. and 2.625 inch. Both sizes were qualified successfully for ,plug,-and-perf applications.

Tremie Pipe - A Underwater Concreting Method
Tremie Pipe - A Underwater Concreting Method

Pumping, is then started. When the pipe is completely filled, the ,plug, is forced out; the concrete surrounding the lower end of the pipe seals the pipe. The ,pumping, is done against the pressure of the ,plug, at the lower end. When the ,pumping, effort required is too great to overcome the pressure, the pipe is withdrawn and the operation is repeated.

25+ Types Of Pile Foundations & Their Application
25+ Types Of Pile Foundations & Their Application

The ,sand, to used should be moist at the time of placing. The top of sandpile mostly covers with concrete for restricting the ejecting upwards due to lateral pressure. ,Sand, piles are spaced at 2 to 3 m, usually under the columns of the structure. A load test should be carried out to determine the bearing capacity of a ,sand, …

US3741308A - Method of consolidating sand formations ...
US3741308A - Method of consolidating sand formations ...

Loose ,sand, is consolidated by passing an aqueous solution of calcium hydroxide through the ,sand,. The solution is prepared and passed in such a fashion that the ,sand, being consolidated reacts with at least about 4.0 grams Ca(OH)2 per liter of pore volume in the ,sand, body. Following this period, an additional time of up to 350 hours may be required, during which the solution remains in contact ...

How to Design and Construct Tubewells? | Ground Water ...
How to Design and Construct Tubewells? | Ground Water ...

2. Development by ,Pumping,: In this method a pump of large capacity is used to withdraw water and ,sand, from the well. The speed of the pump should be kept low initially. ,Pumping, is started till all the ,sand, particles are withdrawn at this speed and clear water comes out continuously. The speed of the pump is now increased and more ,sand, is withdrawn.

BN-G-Y009 Care and Preservation of Equipment During ...
BN-G-Y009 Care and Preservation of Equipment During ...

Blank off all nozzles and ,plug, all vents and drains. Coat all exposed bolts and flanges with heavy grease ... which is not under the ,control, of vendors concerned, equipment guarantees are invalidated. ... Shell Ensis Oil H with 2% VSI 8235, to prevent rusting of the ,pumping, parts, rotate lubricators to fullness with oil. Also fill the crank case.

Mix Design for Pumped Concrete with PPC OPC OPC+Flyash
Mix Design for Pumped Concrete with PPC OPC OPC+Flyash

Once ,pumping, has started, it should not be interrupted (if at all possible) as concrete standing idle in the line is liable to cause a ,plug,. Of greater importance is to always ensure some concrete in the pump receiving hopper at all times during operation, which makes necessary the careful dispatching and spacing of ready-mix truck.

BN-G-Y009 Care and Preservation of Equipment During ...
BN-G-Y009 Care and Preservation of Equipment During ...

Blank off all nozzles and ,plug, all vents and drains. Coat all exposed bolts and flanges with heavy grease ... which is not under the ,control, of vendors concerned, equipment guarantees are invalidated. ... Shell Ensis Oil H with 2% VSI 8235, to prevent rusting of the ,pumping, parts, rotate lubricators to fullness with oil. Also fill the crank case.

WESUBSEA TITANIUM 6” ROV DREDGER SERIES II
WESUBSEA TITANIUM 6” ROV DREDGER SERIES II

• MAX ROCK SIZE (,theoretical,) 140 mm • REMOVAL ,CAPACITY,* 45 m³/h (70t/hr) • HYDRAULIC REQUIREMENT 50-60 Lpm@200 bar (15 US gpm @ 2900 psi) • TITANIUM EJECTOR • WEIGHT IN AIR 75 kg • WEIGHT IN WATER 63 kg *Dependent on operational handling and type of sediment • 3 x ½” CERTIFIED HYDRAULIC HOSES ˜ 3 m LONG

(PDF) Performance of suction caissons in sand and clay
(PDF) Performance of suction caissons in sand and clay

Second, the axial load ,capacity, of ,suction, caissons depends on the rate of loading, hydraulic conductivity, drainage length, as well as the shearing strength properties of the foundation material.

How to Find the Right Pump | Pumps & Systems
How to Find the Right Pump | Pumps & Systems

At sea level, the ,theoretical, maximum ,suction, lift for water is approximately 33.9 feet; however, other factors limit pumps to a practical pumping ,suction, lift that is closer to 25 feet of ,suction, lift with a maximum of approximately 28 feet.

INNOVATIVE RIVERBANK EROSION CONTROL RETAINING WALL …
INNOVATIVE RIVERBANK EROSION CONTROL RETAINING WALL …

sand, stratum with an average SPT blow count of 40 is present to a depth of 75 feet. A stiff clay layer is present below this ,sand, to a depth of 83 ft and is underlain by another dense to very dense ,sand, stratum extending to a depth of 103 ft. Very stiff clay was then encountered to a depth of 130 ft which was the

WESUBSEA TITANIUM 6” ROV DREDGER
WESUBSEA TITANIUM 6” ROV DREDGER

• MAX ROCK SIZE (,theoretical,) 140 mm • REMOVAL ,CAPACITY,* 45 m³/h (70t/hr) • HYDRAULIC REQUIREMENT 50-60 Lpm @ 200 bar (15 US gpm @ 2900 psi) • TITANIUM EJECTOR • WEIGHT IN AIR 75 kg • WEIGHT IN WATER 63 kg *Dependent on operational handling and type of sediment • 3 x ½” CERTIFIED HYDRAULIC HOSES ˜ 3 m LONG

The Purpose and the Structural Composition of the Choke ...
The Purpose and the Structural Composition of the Choke ...

Choke manifold parts are the necessity to ,control, techniques of the well kick and the pressure implement for oil and gas wells. The choke valve plays the role in keeping a certain casing pressure of the well bottom marginally greater than that of the formation in the case of an off blowout preventer to curb the inflow of the formation fluid.

Chat Online Inquiry Email

Business cooperation

+86 513525609655

Company address

Road West, North Branch, Jingkai Road, Puyang City