Welcome to the company ! we have many years of professional experience !
rsdgj@pyzyrsd.com +86 513525609655

highqualitycolor

Established in 2001, Puyang Zhong Yuan Restar Petroleum Equipment Co.,Ltd, “RSD” for short, is Henan’s high-tech enterprise with intellectual property advantages and independent legal person qualification. With registered capital of RMB 50 million, the Company has two subsidiaries-Henan Restar Separation Equipment Technology Co., Ltd We are mainly specialized in R&D, production and service of various intelligent separation and control systems in oil&gas drilling,engineering environmental protection and mining industries.We always take the lead in Chinese market shares of drilling fluid shale shaker for many years. Our products have been exported more than 20 countries and always extensively praised by customers. We are Class I network supplier of Sinopec,CNPC and CNOOC and registered supplier of ONGC, OIL India,KOC. High quality and international standard products make us gain many Large-scale drilling fluids recycling systems for Saudi Aramco and Gazprom projects.

Certificate of Honor

CONTACT US

Customer satisfaction is our first goal!

Phone

+86 513525609655

E-Mail

rsdgj@pyzyrsd.com

Address

Road West, North Branch, Jingkai Road, Puyang City

highqualitycolor
SOIL MECHANICS - vlab.co.in
SOIL MECHANICS - vlab.co.in

a = Cross Sectional area of stand ,pipe, (cm 2). L = ,Length, of soil specimen (cm ) A = Cross-sectional area of soil sample inside the mould (cm 2) t = (t 1 – t2) = Time interval for the ,head, to fall from h1 to h2. h1 = Initial ,head, of water at time t1 in the ,pipe,, measured above the outlet.

WP5.2: Combination of MAR and adjusted conventional ...
WP5.2: Combination of MAR and adjusted conventional ...

Reference ,head, here: hydraulic ,head, in the lower left corner of the model region; unit: [,Length,] Reference ,length, here: synonymous with ,length, (see Figure 7) of the subsurface catchment (from groundwater divide to drainage basin); only used if the hydrological balance is selected for baseflow ,calculation,; unit: [,Length,]

L4W Guide to Designing and Sizing Hydraulic Ram Pump System
L4W Guide to Designing and Sizing Hydraulic Ram Pump System

5. The ,length of pipe, from the water source to the ram pump (c alled the drive ,pipe,). 6. The ,length of pipe, from the pump to the storage site (c alled the delivery ,pipe,). Once this information has been obtained, a ,calculation, can be made to see if the amount of water needed can be supplied by a ram. The formula is: D = (Q x F x E) ÷ L, where:

CHAPTER 3
CHAPTER 3

To understand the phenomenon of quick ,sand, condition, consider the arrangement shown in Fig. 3.3 A soil sample of cross sectional area A and a ,length, L is put in a vertical tube with the fluid total ,head, at the sample bottom higher than that of its top by the value h.

Table of Well Water Volumes & Volume Calculations ...
Table of Well Water Volumes & Volume Calculations ...

Head, loss or friction loss is defined as the energy consumed by turbulence or friction inside the well casing and well piping during ,pumping,. ,Head, loss in a well water system is a function of water ,pipe length,, diameter, bends or elbows, fittings (whose edges form obstructions to water flow inside the ,pipe,), and even piping material.

SOIL MECHANICS ONLINE GATE STUDY MATERIAL CIVILENGGFORALL
SOIL MECHANICS ONLINE GATE STUDY MATERIAL CIVILENGGFORALL

Variable ,Head, Permeability Test –This method is suitable for ,sand, and silt. k = aL/A x log e (h 1 /h 2)/(t 2-t 1) = 2.303 (aL/At) log ­10 (h 1 /h 2) where h 1 and h 2 are ,head, drops corresponding to time t 1 and t 2. a is area of stand ,pipe,. A is cross sectional area of solid specimen – Field Methods. ,Pumping, out test; ,Pumping, in test ...

Report on Sewer Network - Assignment Point
Report on Sewer Network - Assignment Point

Considering this pressure, the height of the overhead tank is found= 8/.434= 18.4 ft. Now, the ,calculation, for determination ,of pipe, size, is shown below. Sample ,Calculation, for ,Pipe, Size Determination of each Floor: At fifth floor, an additional 10’ horizontal ,pipe length, was considered.

CHAPTER 3 WATER SUPPLY SYSTEM - JICA
CHAPTER 3 WATER SUPPLY SYSTEM - JICA

Length, of tank (rectangular) 30 - 100 m - Ratio of ,length, to width 3:1 - 5:1 3:1 - 5:1 ,Length, of square tank up to 20 m - Diameter of tank up to 60 m - Depth of tank 2.5 - 5 m 3 - 4 (Water m Inlet velocity 0.2 - 0.3 m/s less than 0.4 m/s Weir Loading up to 300 m3 /d/500 m3 Rapid ,Sand, Filtration Filtration rate 4.8 - 6 m/hr 5 - 6.25 m/hr

SOIL MECHANICS - vlab.co.in
SOIL MECHANICS - vlab.co.in

a = Cross Sectional area of stand ,pipe, (cm 2). L = ,Length, of soil specimen (cm ) A = Cross-sectional area of soil sample inside the mould (cm 2) t = (t 1 – t2) = Time interval for the ,head, to fall from h1 to h2. h1 = Initial ,head, of water at time t1 in the ,pipe,, measured above the outlet.

WP5.2: Combination of MAR and adjusted conventional ...
WP5.2: Combination of MAR and adjusted conventional ...

Reference ,head, here: hydraulic ,head, in the lower left corner of the model region; unit: [,Length,] Reference ,length, here: synonymous with ,length, (see Figure 7) of the subsurface catchment (from groundwater divide to drainage basin); only used if the hydrological balance is selected for baseflow ,calculation,; unit: [,Length,]

Ashghal guide-qatar-sewerage-amp-drainage-design-manual
Ashghal guide-qatar-sewerage-amp-drainage-design-manual

The size of block is dependent upon the deflection of the flow, the size of the ,pipe, and the ,head, of water inside the ,pipe,. 3.7.2 ,Pumping, Stations Submersible ,Pumping, Stations It is expected that the maximum flows to be pumped will be less than 51/s, for which submersible ,pumping, stations are to be provided.

Submersible motor pumps po-so - oddesse
Submersible motor pumps po-so - oddesse

6- and 8-inch are ,according, to NEMA-standard, ... pipeline of rolled steel clear dim. ,of pipe, 4", ,length, 250 m ,Calculation,: ... Geodetic ,pumping head, and discharge pressure Remark: Clean Water γ = 1 Values of friction losses see table 01_004en/2 l4-3 Submersible motor pumps po-so

Piping Tools and Thermodynamic Excel functions add-ins
Piping Tools and Thermodynamic Excel functions add-ins

(Determination of the ,length, between ,pipe, supports by the method of the "Maximum tension Stress due to bending and ... Wall thickness ,calculation according, ASME B31.3.ods (,Pipe, wall thickness for carbon steel pipes ,according, ASME B31.3. Rev ... (Example of Warman Slurry ,Pumping, Handbook Australasian version, Feb. 2000 Rev. 14.06 ...

CHAPTER 3
CHAPTER 3

To understand the phenomenon of quick ,sand, condition, consider the arrangement shown in Fig. 3.3 A soil sample of cross sectional area A and a ,length, L is put in a vertical tube with the fluid total ,head, at the sample bottom higher than that of its top by the value h.

IMO PUMPS By Chemfluid Engineering Sdn BHD: 2009
IMO PUMPS By Chemfluid Engineering Sdn BHD: 2009

Sand, is highly abrasive material to be pumped and the following operating parameter shall be considered Right Speed : Operating the pump at 4000 rpm is certainly not right Lower or check the actual system ,head, and bring down the speed to correct Duty Point.Ideally the pump speed should not exceed 1200 rpm Right Material of Construction

Chat Online Inquiry Email

Business cooperation

+86 513525609655

Company address

Road West, North Branch, Jingkai Road, Puyang City